Upgrading Stair Balustrades For Brighton and Hove Football Club

Project: Upgrading Stair Balustrades – Brighton and Hove Football Club
EMS Ltd designed, manufactured and installed bespoke glass balustrades across six flights of stairs for Brighton & Hove Football Club
Qualifications Required:
- Welder Qualification BS EN 9606
- Procedures to BS EN ISO 51614
- BS EN 1090-2 Execution Class 2
Work Completed:
Removal of the existing stair balustrade on six flights of stairs, installation of new bespoke stainless steel uprights and handrail with Glass infill panels.
Drawings were supplied to the customer for approval once a scan survey had been completed of the existing fixing points required for the new installation.
Size Of Team:
5 Engineers